Before constructing a dam, the factor to be considered for controlling sedimentation, is
selection of dam site
construction of check dams
providing vegetation screens
providing under-sluices in the dam
All the above.
Correct Answer:
All the above.
← Previous Question
Next Question→
More Questions from
Water Supply Engineering
A slow sand filter is cleaned if its filter head is higher than
Normal values of overflow rate for plain sedimentation tank using coagulants, is
If the specific capacity of a well is 0.3183 x 10-3 per sec, the discharge from a well of 4 m diameter under a depression head of 4 m, is
The maximum pressure to which a pipe is subjected to during its operation, is known
The factor to be considered for the source of city water supply, is
Pick up the correct statement from the following :
Dead storage of a reservoir of Q capacity generally provided for silt deposition during its life time, is generally kept
The capability of a soil mass of full width and depth to transmit water, is known
Sluice valves in main water supplies
Pick up the correct statement from the following :
Discussion & Comments
No comments yet. Be the first to comment!
Name:
Comment:
Post Comment
Join Discussion
Discussion & Comments