The sewers
must be of adequate size to avoid over flow
must flow under gravity to full
must be laid at least 2 to 3 m deep to collect /water from the basements
all the above.
Correct Answer:
all the above.
← Previous Question
Next Question→
More Questions from
Waste Water Engineering
For detecting the nitrites in the sewage, the matching colour may be developed by adding
Aerobic activity is maximum
Hazin's formula is used for the settlement velocity of the particles of diameter
If n is the rugosity coefficient, r is the hydraulic depth, s is the bed slope of sewer, the velocity of flow in m/sec may be obtained by the formula evolved by
If the length of overland flow from the critical point to the mouth of drain is 13.58 km and difference in level between the critical point and drain mouth is 10 m, the inlet time is
The settlement of a particle in sedimentation tank, is affected by
Sewer manholes are generally provided at
The laying of sewers is done with
For drains up to 15 cumecs, the depth d and width B are related by
Pathogens (or pathogentic bacterias) in water may cause