The wall constructed for the stability of a back filling portion of a road on the down hill side, is known as
retaining wall
breast wall
parapet wall
all the above.
Correct Answer:
retaining wall
← Previous Question
Next Question→
More Questions from
Highway Engineering
The most commonly adopted method to provide super-elevation on roads, is by pivoting the road surface about
The traffic carrying capacity of a single lane, depends on
Floating gradients are generally provided
Width of the shoulders of carriage way is generally kept
An upgrade g1% is followed by a downgrade g2%. The equation of the parabolic curve of length L to be introduced, is given by
If L is the length of vehicles in metres, C is the clear distance between two consecutive vehicles (stopping sight distance), V is the speed of vehicles in km/hour, the maximum number N of vehicles/hour, is
The usual width of side drains along Highways in hilly region, is
The pavement width of a road depends upon
Pick up the correct statement from the following:
Enoscope is used to determine
Discussion & Comments
No comments yet. Be the first to comment!
Name:
Comment:
Post Comment
Join Discussion
Discussion & Comments