Curioustab
Aptitude
General Knowledge
Verbal Reasoning
Computer Science
Interview
Aptitude
General Knowledge
Verbal Reasoning
Computer Science
Interview
Home
»
Civil Engineering
»
Highway Engineering
The G.T. road from Lahore to Calcutta in undivided India, was constructed during
3495-3500 BC
265-270 BC
1540-1545 AD
1440-1450
Correct Answer:
1540-1545 AD
← Previous Question
Next Question→
More Questions from
Highway Engineering
When each particle of aggregates is thinly coated with cement paste, a heterogeneous solid is formed, which is known as
The full width of land acquired before finalising a highway, alignment is known
The width of the right of way in urban area, is kept between 24 m to 60 m for
Extra widening required at a horizontal curve on a single lane hill road of radius 80 m for a design speed of 50 km ph and for a vehicle with wheel base 6.0 m is
If a Lemniscate curve of transition throughout is introduced to connect two parallel roads, the maximum polar angle of the curve, is
Retaining walls are generally constructed with dry rubble stones with 60 cm top width and
The ability of a driver to stop the vehicle moving with the designed speed, depends upon:
In cement concrete pavements, tensile stress is due to :
During last phase of the reconnaissance, details of the grade line is recorded on 2 metre poles to indicate
The radius of curvature provided along a transition curve, is
Discussion & Comments
No comments yet. Be the first to comment!
Name:
Comment:
Post Comment
Join Discussion
Discussion & Comments