Curioustab
Aptitude
General Knowledge
Verbal Reasoning
Computer Science
Interview
Aptitude
General Knowledge
Verbal Reasoning
Computer Science
Interview
Home
»
Civil Engineering
»
Highway Engineering
The first stage of deciding the alignment of a hill road, is
reconnaissance
detailed survey
trace-out
preliminary survey.
Correct Answer:
reconnaissance
← Previous Question
Next Question→
More Questions from
Highway Engineering
The shape of a vertical curve, is
While designing hair pin bends on higways, the minimum
Minimum thickness of a layer of fine sand required to cut off capillary rise of water completely, should be
The ideal shape of a transition curve, is
Passing zones are generally not provided on
While calculating the sight distances, the driver's eye above road surface, is assumed
Minimum permissible speed on high speed roads, is decided on the basis of
If D is the degree of a curve, the percentage reduction of gradient, is
To indicate proper control of consistency of a freshly mixed concrete for pavement construction, the slump should be between
If x% is the gradient of an alignment and y% is the gradient after proper superelevation along a curved portion of a highway, the differential grade along the curve, is
Discussion & Comments
No comments yet. Be the first to comment!
Name:
Comment:
Post Comment
Join Discussion
Discussion & Comments