Pick up the incorrect statement from the following:
The bottom and top ends of slump mould are parallel to each other
The axis of the mould is perpendicular to the end faces
The internal surface of the mould is kept clean and free from set cement
The mould is in the form of a frustum of hexagonal pyramid
None of these.
Correct Answer:
The mould is in the form of a frustum of hexagonal pyramid
← Previous Question
Next Question→
More Questions from
Concrete Technology
C.R.R.I. charts are used to obtain a relatioship between strength of concrete and
Proper batching ensures
If the depth of moist sand in a cylinder is 15 cm and the depth of the sand when fully inundated with water is 12 cm, the bulking of the moist sand, is
Water required per bag of cement, is
Addition of pozzolana to ordinary port land cement, causes
For batching 1:3:6 concrete mix by volume, the ingredients required per bag of 50 kg cement, are:
ISI has specified full strength of concrete after
Pick up the correct statement from the following:
A construction joint is provided where
Hardening of cement occurs at