Curioustab
Aptitude
General Knowledge
Verbal Reasoning
Computer Science
Interview
Aptitude
General Knowledge
Verbal Reasoning
Computer Science
Interview
Home
»
Civil Engineering
»
Concrete Technology
To ensure constant moisture content in aggregates
area of each aggregate pile should be large
height of each aggregate pile should not exceed 1.50 m
aggregate pile should be left for 24 hours before aggregates are used
conical heaps of aggregates should be avoided to prevent moisture variation
all the above.
Correct Answer:
all the above.
← Previous Question
Next Question→
More Questions from
Concrete Technology
While compacting the concrete by a mechanical vibrator, the slump should not exceed
Construction joints are generally provided in concrete
For quality control of Portland cement, the test essentially done is
The maximum amount of dust which may be permitted in aggregates is
Pick up the correct statement from the following:
For the construction of cement concrete floor, the maximum permissible size of aggregate, is
For road pavements, the cement generally used, is
Pick up the correct proportions of chemical ingredients of cement
If X, Y and Z are the fineness modulli of coarse, fine and combined aggregates, the percentage (P) of fine aggregates to combined aggregates, is
The bulk density of aggregates does not depend upon :
Discussion & Comments
No comments yet. Be the first to comment!
Name:
Comment:
Post Comment
Join Discussion
Discussion & Comments