Depth of lean concrete bed placedat the bottom of a wall footing, is kept
10 cm
15 cm
equal to its projection beyond wall base
less than its projection beyond wall base.
Correct Answer:
equal to its projection beyond wall base
← Previous Question
Next Question→
More Questions from
Building Construction
Exposed portions of vertical surface at right angles to the door or window frame, are known as
The opening provided in sloping roof with its top parallel to the roof surface, is called
The foundation which consists of a thick reinforced cement slab covering whole area to support heavy concentrated structural loads, is known as
Rotary drilling
Pick up the incorrect statement from the following:
The process of keeping concrete moist for a certain period after its finishing, is known as
Dutch bond is a modification of
Bearing capacity of soils cannot be improved by
The dimensions of a half queen closer, are
In case of foundations on sandy soil, maximum permissible differential settlement, is usually limited to
Discussion & Comments
No comments yet. Be the first to comment!
Name:
Comment:
Post Comment
Join Discussion
Discussion & Comments