Production Engineering problems


  • 1. Discontinuous chips are formed during machining of

  • Options
  • A. brittle metals
  • B. ductile metals
  • C. hard metals
  • D. soft metals
  • Discuss
  • 2. The lathe centres are provided with standard taper known as

  • Options
  • A. Morse taper
  • B. Seller's taper
  • C. Chapman taper
  • D. Brown and Sharpe taper
  • Discuss
  • 3. The operation of smoothing and squaring the surface around a hole is known as

  • Options
  • A. counter-sinking
  • B. counter-boring
  • C. trepanning
  • D. spot facing
  • Discuss
  • 4. In metal cutting operations, the shear angle is the angle made by the shear plane with the

  • Options
  • A. direction of the tool axis
  • B. direction of tool travel
  • C. perpendicular to the direction of the tool axis
  • D. central plane of the workpiece
  • Discuss
  • 5. An operation of enlarging the end of a hole cylindrically is known as grooving.

  • Options
  • A. Correct
  • B. Incorrect
  • Discuss
  • 6. Which of the following statement is wrong as regard to down milling?

  • Options
  • A. It can not be used on old machines due to backlash between the feed screw of the table and the nut.
  • B. The chips are disposed off easily and do not interfere with the cutting.
  • C. The surface milled appears to be slightly wavy.
  • D. The coolant can be poured directly at the cutting zone where the cutting force is maximum.
  • Discuss
  • 7. The infeed grinding is similar to plunge grinding.

  • Options
  • A. Yes
  • B. No
  • Discuss
  • 8. Cemented carbide tools are generally poor in shear.

  • Options
  • A. Yes
  • B. No
  • Discuss
  • 9. If the cutting speed is increased, then the built-up-edge

  • Options
  • A. becomes longer
  • B. may or may not form
  • C. becomes smaller and finally does not form at all
  • D. has nothing to do with speed
  • Discuss
  • 10. It is required to cut screw threads of 2 mm pitch on a lathe. The lead screw has a pitch of 6 mm. If the spindle speed is 60 r.p.m., then the speed of lead screw will be

  • Options
  • A. 10 r.p.m.
  • B. 20 r.p.m.
  • C. 120 r.p.m.
  • D. 180 r.p.m.
  • Discuss