Construction Management problems


  • 1. PERT analysis is based on

  • Options
  • A. optimistic time
  • B. pessimistic time
  • C. most likely time
  • D. all the above.
  • Discuss
  • 2. For the supply of materials for concrete, form work reinforcing and placing of concrete, removal of form work and curing of concrete, number of bar(s) required on bar chart, is

  • Options
  • A. 1
  • B. 2
  • C. 3
  • D. 4
  • Discuss
  • 3. While filling the tender for any work, the contractor considers

  • Options
  • A. site survey
  • B. availability of construction materials
  • C. availability of labour
  • D. study of specifications
  • E. all the above.
  • Discuss
  • 4. Pick up the correct statement from the following:

  • Options
  • A. The difference of latest occurence time and earliest expected time, is called slack
  • B. The activities connecting the events having zero slack, lie on the critical path
  • C. The critical path consumes the maximum time
  • D. All the above.
  • Discuss
  • 5. The main advantage of line organisation, is :

  • Options
  • A. effective command and control
  • B. defined responsibilities at all levels
  • C. rigid discipline in the organisation
  • D. ability of quick decision at all levels
  • E. all the above.
  • Discuss
  • 6. Pick up the correct statement from the following:

  • Options
  • A. Forward pass is used for calculating earliest expected time
  • B. Backward pass is used for calculating the latest occurence time
  • C. Maximum value of earliest expected time is used if there are more than one value of any event
  • D. Minimum value of latest occurrence time is used if there are more than one value of any event
  • E. All the above.
  • Discuss
  • 7. The main disadvantage of line organisation, is

  • Options
  • A. rigid structure
  • B. extraordinary delay in communications
  • C. top level executions over work
  • D. all the above.
  • Discuss
  • 8. Pick up the incorrect statement from the following:

  • Options
  • A. The various functions under each activity, are shown by one bar on Bar Charts
  • B. Bar chart establishes the interdependency of one event on another
  • C. Only approximate percentage of the completed work is reported
  • D. None of these,
  • Discuss
  • 9. For completion of a project, the critical path of the network represents

  • Options
  • A. minimum time
  • B. maximum time
  • C. maximum cost
  • D. minimum cost.
  • Discuss
  • 10. Pre-tender stage requires

  • Options
  • A. acquisition of land
  • B. selection of site
  • C. formalisation of alignment of work
  • D. formalisation of designs and preparation of estimate
  • E. all the above.
  • Discuss