Curioustab
Aptitude
General Knowledge
Verbal Reasoning
Computer Science
Interview
Aptitude
General Knowledge
Verbal Reasoning
Computer Science
Interview
Home
»
Mechanical Engineering
»
Industrial Engineering and Production Management
Dispatching
prescribes the sequence of operations to be followed
determines the programme for the operations
is concerned with the starting of processes
regulates the progress of job through various processes
Correct Answer:
is concerned with the starting of processes
← Previous Question
Next Question→
More Questions from
Industrial Engineering and Production Management
String diagram is used
Which of the following are the guidelines for the construction of a network diagram?
Gantt chart is used for
In break even analysis, total cost consists of
A-B-C analysis is used in
The probabilistic time is given by (where to = Optimistic time, tp = Pessimistic time, and tn = Most likely time)
PERT requires
Linear programming model can be applied to line balancing problem and transportation problem.
When slack of an activity is negative
If F is the fixed cost, V is the variable cost per unit (or total variable costs) and P is the selling price of each unit (or total sales value), then break even point is equal to
Discussion & Comments
No comments yet. Be the first to comment!
Name:
Comment:
Post Comment
Join Discussion
Discussion & Comments