logo

CuriousTab

CuriousTab

Discussion


Home Civil Engineering GATE Exam Questions Comments

  • Question
  • The stepped cantilever is subjected to moments, M as shown in the figure below. The vertical deflection at the free end (neglecting the self weight) is
    The stepped cantilever is subjected to moments, M as shown in the figure below. The vertical deflect


  • Options
  • A. The stepped cantilever is subjected to moments, M as shown in the figure below. The vertical deflect
  • B. The stepped cantilever is subjected to moments, M as shown in the figure below. The vertical deflect
  • C. The stepped cantilever is subjected to moments, M as shown in the figure below. The vertical deflect
  • D. Zero

  • Correct Answer
  •  


  • GATE Exam Questions problems


    Search Results


    • 1. If the shear force at a section of beam under bending is equal to zero then the bending moment at the section is

    • Options
    • A. zero
    • B. maximum
    • C. minimum
    • D. minimum or maximum
    • Discuss
    • 2. The maximum permissible deflection for a gantry girder, spanning over 6 m, on which an EOT (electric overhead travelling) crane of capacity 200 kN is operating, is

    • Options
    • A. 8 mm
    • B. 10 mm
    • C. 12 mm
    • D. 18 mm
    • Discuss
    • 3. Use of coagulants such as alum

    • Options
    • A. results in reduction of pH of the treated water.
    • B. results in increase of pH of the treated water.
    • C. results in no chnage in pH of the treated water.
    • D. may cause an increase in decrease of decrease of pH of the treated water.
    • Discuss
    • 4. In network of pipes

    • Options
    • A. the algebraic sum of discharges around each circuit is zero
    • B. the algebraic sum of (pressure + datum) head drops around each circuit is zero
    • C. the elevation of hydraulic grade line is assumed for each junction point
    • D. elementary circuits are replaced by equivalent pipes
    • Discuss
    • 5. It is proposed to widen and strengthen an existing 2-lane NH section as a divided highway. The existing traffic in one direction is 2500 commercial vehicles (CV) per day. The construction will take 1 year. The design CBR of soil subgrade is found to be 5 percent, Given: traffic growth rate for CV = 8 percent, vehicle damage factor = 3.5 (standard axles per CV), design life = 10 years and traffic distribution factor = 0.75. The cumulative standard axles (msa) computed are

    • Options
    • A. 35
    • B. 37
    • C. 65
    • D. 70
    • Discuss
    • 6. A footing 2 m x 1 m exerts a uniform pressure of 150 kN/m2 on the soil. Assuming a load dispersion of 2 vertical to 1 horizontal the average vertical stress (kN/m2) at 1.0 m below the footing is

    • Options
    • A. 50
    • B. 75
    • C. 80
    • D. 100
    • Discuss
    • 7. Bituminous materials are commonly use in highway construction because of their good

    • Options
    • A. tensile and compression properties.
    • B. binding and water proofing properties.
    • C. shear strength and tensile properties.
    • D. bond and tensile properties.
    • Discuss
    • 8. A road is provided with a horizontal circular curve having deflection angle of 55° and centre line radius of 250 m. A transition curve is to be provided at each end of the circular curve of such a length that the rate of gain of radial acceleration is 0.3 m/s3 at a speed of 50 km per hour. Length of the transition curve required at each of the ends is

    • Options
    • A. 2.57 m
    • B. 33.33 m
    • C. 35.73 m
    • D. 1666.67 m
    • Discuss
    • 9. Group symbols assigned to silty sand and clayey sand are respectively

    • Options
    • A. SS and CS
    • B. SM and CS
    • C. SM and SC
    • D. MS and CS
    • Discuss
    • 10. A hyetograph is a graph representing

    • Options
    • A. rainfall volume with time
    • B. rainfall intensity with time
    • C. rainfall intensity with duration
    • D. rainfall intensity over an area
    • Discuss


    Comments

    There are no comments.

Enter a new Comment