  • Question
  • Pick up the correct statement from the following :


  • Options
  • A. The intensity of rain is the rate at which it falls
  • B. The duration of rain is the time for which it falls with a given intensity
  • C. The frequency of rain is the number of times, if falls
  • D. All the above.

  • Correct Answer
  • All the above. 


  • Water Resources Engineering problems


    Search Results


    • 1. Izzard formula for the time of concentration in minutes for the plots having no channels, is (where Lo is the length of overland flow in metres and Kp rainfall intensity in cm/hour)

    • Options
    • A.
    • B.
    • C.
    • D.
    • Discuss
    • 2. For high flood estimates the average value of the constant C in Dicken's formula Q = CA3/4, is

    • Options
    • A. 6.5
    • B. 8.5
    • C. 9.5
    • D. 10.5
    • E. 11.5
    • Discuss
    • 3. In nature water may occur as

    • Options
    • A. liquid
    • B. solid
    • C. vapours
    • D. all the above.
    • Discuss
    • 4. The average mean velocity of a stream having depth h, may be obtained by taking the average of the readings of a current meter at a depth of

    • Options
    • A. 0.1 h and 0.9 h
    • B. 0.2 h and 0.8 h
    • C. 0.3 h and 0.7 h
    • D. 0.4 h and 0.6 h.
    • Discuss
    • 5. A unit hydrograph is a hydrograph of a rain storm of a specified duration resulting from a run-off of

    • Options
    • A. 15 mm
    • B. 20 mm
    • C. 25 mm
    • D. 30 mm.
    • Discuss
    • 6. Non-recording rain gauges

    • Options
    • A. collect the rain whose volume is measured by means of graduated cylinders
    • B. collect the rain which is directly measured by means of graduated cylinders in centimetres of water depth
    • C. are generally used in hilly terrain
    • D. are cylindrical in shape.
    • Discuss
    • 7. Isohytes are the imaginary lines joining the points of equal

    • Options
    • A. pressure
    • B. height
    • C. humidity
    • D. rainfall.
    • Discuss
    • 8. In the estimate of design flood, Dickens assumes that high flood in cumecs, is proportional to catchment area raised to the power

    • Options
    • A.
    • B.
    • C.
    • D.
    • Discuss
    • 9. Boston society of Civil Engineer's formula in cumecs/square km is based upon

    • Options
    • A. rainfall and drainage area
    • B. total run off and drainage area
    • C. drainage area and its shape
    • D. drainage area.
    • Discuss
    • 10. From the pattern of the rainfall shown in the below figure, the total precipitation is

    • Options
    • A. 4 cm
    • B. 4.5 cm
    • C. 5 cm
    • D. 5.5 cm
    • E. 6 cm.
    • Discuss