logo

CuriousTab

CuriousTab

Discussion


Home Computer Science System Analysis and Design Comments

  • Question
  • A branch office, location or other data processing centres, where a newly developed system is used under normal operating conditions for several months, to test it, is called


  • Options
  • A. beta test data
  • B. alpha test data
  • C. string test data
  • D. system test data
  • E. None of the above

  • Correct Answer
  • beta test data 


  • System Analysis and Design problems


    Search Results


    • 1. Back-up procedure helps in

    • Options
    • A. restoring the operation whenever there is a disk failure
    • B. restoring both application and system software whenever there is disk corruption.
    • C. restoring the data files whenever there is a system crash
    • D. All of the above
    • E. None of the above
    • Discuss
    • 2. An appraisal, of a system's performance after it has been installed, is called system

    • Options
    • A. planning
    • B. review
    • C. maintenance
    • D. batch Processing
    • E. None of the above
    • Discuss
    • 3. Problem analysis is done during

    • Options
    • A. system design phase
    • B. systems analysis phase
    • C. before system test
    • D. All of the above
    • E. None of the above
    • Discuss
    • 4. The mistake, committed by interchanging two digits in a numeric held, during data entry, is called

    • Options
    • A. transposition error
    • B. transcription error
    • C. Beta testing error
    • D. Alpha testing error
    • E. None of the above
    • Discuss
    • 5. The approach used in top-down analysis and design is

    • Options
    • A. to identify the top level functions by combining many smaller components into a single entity
    • B. to prepare flow charts after programming has been completed
    • C. to identify a top level function an d then create a hierarchy of lower-level modules and components.
    • D. All of the above
    • E. None of the above
    • Discuss
    • 6. A problem's _____ will answer the question, "What information will the computer need to know in order to either print or display the output times?"

    • Options
    • A. Input
    • B. Output
    • C. Processing
    • D. Purpose
    • E. None of the above
    • Discuss
    • 7. The primary tool used in structured design is a:

    • Options
    • A. data-flow diagram
    • B. module
    • C. structure chart
    • D. program flowchart
    • E. None of the above
    • Discuss
    • 8. On the feasibility committee, department representatives serve as:

    • Options
    • A. direct users of the new system
    • B. liaison to their departments
    • C. ready sources of information
    • D. All of the above
    • E. None of the above
    • Discuss
    • 9. System Implementation Phase entails

    • Options
    • A. System check outs
    • B. Pilot run
    • C. Parallel runs
    • D. All of the above
    • E. None of the above
    • Discuss
    • 10. Which of the following is (are) not a tool for Application Prototyping?

    • Options
    • A. Application generators
    • B. third generation language
    • C. screen generators
    • D. report generators
    • E. None of the above
    • Discuss


    Comments

    There are no comments.

Enter a new Comment