A portion of an embankment having a uniform up-gradient 1 in 500 is circular with radius 1000 m of the centre line. It subtends 180° at the centre. If the height of the bank is 1 m at the lower end, and side slopes 2:1, the earth work involved.
Options
A. 26, 000 m3
B. 26, 500 m3
C. 27, 000 m3
D. 27, 500 m3
Correct Answer
27, 500 m3
Estimating and Costing problems
Search Results
1. If the formation level of a highway has a uniform gradient for a particular length, and the ground is also having a longitudinal slope, the earthwork may be calculated by