Curioustab
Aptitude
General Knowledge
Verbal Reasoning
Computer Science
Interview
Aptitude
General Knowledge
Verbal Reasoning
Computer Science
Interview
Home
»
Civil Engineering
»
Waste Water Engineering
The spacing of bars of perforations of fine screens used for the treatment of sewage, is
2 to 3 mm
3 to 5 mm
5 to 8 mm
8 to 10 mm.
Correct Answer:
2 to 3 mm
← Previous Question
Next Question→
More Questions from
Waste Water Engineering
Sewer pipes are designed for maximum discharge with 25% to 33% vacant cross-sectional area for
The water carried sewerage system removes
The design period in years for pumping plants, is
The Chezy's constant C in the formula V = C rs depends upon
Water content of sewage is about
For trunk sewers more than 1.25 m in diameter, the ratio of the maximum daily sewage flow to the average daily sewage flow is assumed
Afive day B.O.D. at 15°C of the sewage of a town is 100 kg/day. If the 5 day B.O.D. per head at 15°C for standard sewage is 0.1 kg/day, the population equivalent is
If the peak discharge of a storm water drain (S.W. Drain) is e.xpected to exceed 150 cumecs, the free board to be provided, is
For a grit chamber, if the recommended velocity of flow is 0.2 m/sec and detention period is 2 minutes, the length of the tank, is
At the junction of sewers
Discussion & Comments