The design period in years for pumping plants, is
1
2 to 3
3 to 5
5 to 10
Correct Answer:
5 to 10
← Previous Question
Next Question→
More Questions from
Waste Water Engineering
The Chezy's constant C in the formula V = C rs depends upon
Water content of sewage is about
For trunk sewers more than 1.25 m in diameter, the ratio of the maximum daily sewage flow to the average daily sewage flow is assumed
Afive day B.O.D. at 15°C of the sewage of a town is 100 kg/day. If the 5 day B.O.D. per head at 15°C for standard sewage is 0.1 kg/day, the population equivalent is
If the peak discharge of a storm water drain (S.W. Drain) is e.xpected to exceed 150 cumecs, the free board to be provided, is
For a grit chamber, if the recommended velocity of flow is 0.2 m/sec and detention period is 2 minutes, the length of the tank, is
At the junction of sewers
The pH value of fresh sewage is usually
Depletion of ozone layer in the outer atmosphere may cause
The density of population over 40 hectares is 250/hectare. If water supply demand per day is 200 litres and sewage discharge is 80% of water supply, the sewage flow in sewers of separate system, is
Discussion & Comments
No comments yet. Be the first to comment!
Name:
Comment:
Post Comment
Join Discussion
Discussion & Comments