5 days-biochemical oxygen demand (BOD5) is taken at a temperature of
0°C
15°C
20°C
25°C.
Correct Answer:
20°C
← Previous Question
Next Question→
More Questions from
Waste Water Engineering
Which one of the following statements regarding septic tanks is wrong :
Design period of 40 to 50 years is adopted for
The most widely used pump for lifting sewage is
The maximum spacing of manholes specified by Indian standard in sewers upto 0.3 m diameter is
The sludge does not contain waste water from
The self-cleansing velocity of water flowing through pipe lines, is
The spacing of bars of perforations of fine screens used for the treatment of sewage, is
Sewer pipes are designed for maximum discharge with 25% to 33% vacant cross-sectional area for
The water carried sewerage system removes
The design period in years for pumping plants, is