For full face method, the excavation to be done is generally divided into
two sections
three sections
four sections
five sections.
Correct Answer:
three sections
← Previous Question
Next Question→
More Questions from
Tunnelling
The concentration of the dust particles of the size 0.5 to 5 microns adjacent to the working face should not be more than
A tunnel is found more advantageous as compared to the alternate routes because it:
In case of railways,
The following operations are required for tunnelling in rocky terrain : 1. Removing the foul gases 2. Marking the tunnel profile 3. Setting up and drilling 4. Checking misfire 5. Mucking The correct sequence is :
Pick up the correct statement from the following:
Which one of the following methods is adopted for permanent drainage of tunnels :
For B.G. single track, the section of the tunnel must have a width
An overhead track on a large truss frame is required in case of car changer by
For B.G. single track railway, the height of the tunnel above top of rails should be
For transferring the tunnel alignment through shafts, we adopt the following steps : 1. Hanging two or more plumb lines in the shaft 2. Determining the bearing of the plumb lines i.e. plumb plane 3. Suspending a 35 kg weight by each plumb line 4. Immersing the weights of both the plumb lines in the buckets containing water. The correct sequence of steps is :
Discussion & Comments
No comments yet. Be the first to comment!
Name:
Comment:
Post Comment
Join Discussion
Discussion & Comments