If a linear traverse follows a sharp curve round a large lake where it is difficult to have long legs, the accuracy of the traverse may be improved by
taking short legs
making repeated observations of angular and linear measurements
making a subsidiary traverse to determine the length of a long leg
all the above.
Correct Answer:
making a subsidiary traverse to determine the length of a long leg
← Previous Question
Next Question→
More Questions from
Surveying
The operation of resection involves the following steps rough orientation of the plane table the three lines form a triangle of error drawing lines back through the three control points select a point in the triangle of error such that each ray is equally rotated either clockwise or anti clockwise the points obtained by three rays is the correct location. The correct sequence is
Pick up the correct statement from the following
Check lines (or proof lines) in Chain Surveying, are essentially required
The distance between terminal points computed from a subsidiary traverse run between them, is generally known, as
A sewer is laid from a manhole A to a manhole B, 250 m away along a gradient of 1 in 125. If the reduced level of the invert at A is 205.75 m and the height of the boning rod is 3 m, the reduced level of the sight rail at B, is
For locating a distant object visible from two transit stations, the method usually preferred to, is
Chain surveying is well adopted for
The line of collimation method of reduction of levels, does not provide a check on
Short offsets are measured with
The approximate formula for radial or perpendicular offsets from the tangent, is