In water bound macadam roads, binding material, is
sand
stone dust
cement
brick dust.
Correct Answer:
stone dust
← Previous Question
Next Question→
More Questions from
Highway Engineering
If R is the radius of a main curve and L is the length of the transition curve, the shift of the curve, is
Traffic surveys are carried out
On the recommendations of Indian Road Congress, the ruling gradient in plains, is
Maximum number of passenger cars that can pass a given point on a road during one hour under the most ideal road way and traffic conditions, is known as
The total length of a valley formed by two gradients - 3% and + 2% curve between the two tangent points to provide a rate of change of centrifugal acceleration 0.6 m/sec2, for a design speed 100 km ph, is
Volume of traffic which would immediately use a new road or an improved one when opened to traffic, is known
If N is deviation angle the length L of a parabolic vetical curve for overtaking sight distance S, is
The maximum safe speed on roads, depends on the
The head light of vehicles should be such that its lower beam illuminates objects at
According to the recommendations of Nagpur Conference, the width formation of an ideal National Highway in hard rock cutting, is
Discussion & Comments
No comments yet. Be the first to comment!
Name:
Comment:
Post Comment
Join Discussion
Discussion & Comments