Curioustab
Aptitude
General Knowledge
Verbal Reasoning
Computer Science
Interview
Aptitude
General Knowledge
Verbal Reasoning
Computer Science
Interview
Home
»
Civil Engineering
»
Highway Engineering
Pick up the correct statement from the following:
Borrow pits are located out side the right of way
Borrow pits may be located on either side of the right of way
Spoil bank is located on one side of the right of way
All the above.
Correct Answer:
All the above.
← Previous Question
Next Question→
More Questions from
Highway Engineering
Pick up the correct statement from the following:
Horizontal curves on highways are provided
If the difference in elevation of an edge of the pavement 9 m wide and its crown is 15 cm, the camber of the pavement, is
Gradient resistance of moving vehicles along down slopes, is
Reduction of load capacity in a ruling gradient of
A subsidiary area in a carriageway placed so as to control the movement of the traffic, is
Widening of the roads on curves in hilly region, is done
Traffic census is carried out for
Minimum radius of curvature of National Highways or State highways in hill region free from snow, is kept
The desirable camber for straight roads with water bound macadam or gravel surface, is
Discussion & Comments
No comments yet. Be the first to comment!
Name:
Comment:
Post Comment
Join Discussion
Discussion & Comments