Pick up the correct statement from the following:
The operation of removing material from the sea or river bed is known as
Dredging
Digging
None of these.
Correct Answer:
The operation of removing material from the sea or river bed is known as
← Previous Question
Next Question→
More Questions from
Docks and Harbours
The beach is built:
Surf zone is :
Littoral drift
A harbour is a place where
Pick up the incorrect statement from the following:
Depth of borings for soil investigation, is generally kept below low water level
A roadstead :
The variation of atmospheric potential is caused due to :
On the sea shore structures, the water wave impact causes
Location of soundings by two angles from the shore requires establishing