The shuttering of a hall measuring 4 m x 5 m, can be removed after
5 days
7 days
10 days
14 days
21 days
Correct Answer:
7 days
← Previous Question
Next Question→
More Questions from
Concrete Technology
Log Angles machine is used to test the aggregate for
If the effective plan area of a warehouse is 54 sq. m, and maximum height of piles permitted is 270 cm, the number of cement bags to be stored, is
To prevent segregation, the maximum height for placing concrete, is
For a good concrete
Pick up the incorrect statement from the following:
If 50 kg of fine aggregates and 100 kg of coarse agregates are mixed in a concrete whose water cement ratio is 0.6, the weight of water required for harsh mix, is
Pick up the correct statement from the following:
The strength and quality of concrete, depend upon:
Inert material of a cement concrete mix, is
Pick up the correct statement from the following: