In the method of voids for determination of the quantity of cement paste, it is assumed that
Voids in coarse aggregates are filled by fine aggregates
Voids in fine aggregates are filled by the cement paste
Volume of fine aggregates is equal to total voids in coarse aggregates plus 10% extra
Volume of cement paste required is equal to total volume of voids in fine aggregates plus 15% extra
All the above.
Correct Answer:
All the above.
← Previous Question
Next Question→
More Questions from
Concrete Technology
Curing of pavements, floors, roofs and slabs, is done by
For a concrete mix 1:3:6 and water cement ratio 0.6 both by weight, the quantity of water required per bag, is
The surface where two successive placements of concrete meet, is known as
The minimum percentage of chemical ingredient of cement is that of
Concrete is unsuitable for compaction by a vibrator if it is
Pick up the correct statement from the following:
A concrete using an air entrained cement
Sand generally contains salt if it is obtained from:
Pick up the correct statement from the following:
'Ware house pack' of cement means