To stagger vertical joints in successive courses of a wall, a piece of brick is generally used at the end of the course, which is known as
bat
header
stretcher
closer.
Correct Answer:
closer.
← Previous Question
Next Question→
More Questions from
Building Construction
Pile foundations are suitable for
Pick up the consideration to the taken while designing a hospital from the following :
The nominal thickness of one brick wall in mm, is
According to National Building Code, the hydrants in water mains is provided at minimum interval of
In verandah floors outward slope is
The projections of head or sill of a door or window frame, are
Rotary drilling is the fastest method in case of
The least bearing capacity of soil is that of
The nominal thickness of an expansion joint in brick walls, is kept more than
The vertical members fixed between steps and hand rail, are known
Discussion & Comments
No comments yet. Be the first to comment!
Name:
Comment:
Post Comment
Join Discussion
Discussion & Comments