More Questions from Time and Work

A, B and C can do a piece of work in 20, 30 and 60 days respectively. In how many days can A do the work if he is assisted by B and C on every third day?

Aptitude Time and Work Difficulty: Easy
Choose an option
  • A
    12 days
  • B
    15 days
  • C
    16 days
  • D
    18 days

Answer

Correct Answer: 15 days

Explanation

### Concept & Periodic Assistance Cycles When a primary worker is assisted periodically (e.g., every third day), calculate the total work produced over the complete period (the multi-day cycle) before repeating. ### Step-by-Step Solution * **Determine Total Work and Efficiencies:** * LCM of 20, 30, and 60 is 60. Let Total Work = 60 units. * A's efficiency = $60 \div 20 = 3 \text{ units/day}$. * B's efficiency = $60 \div 30 = 2 \text{ units/day}$. * C's efficiency = $60 \div 60 = 1 \text{ unit/day}$. * **Analyze the 3-Day Work Cycle:** * A works continuously, but receives help from both B and C only on the third day. * Day 1: A works alone = 3 units. * Day 2: A works alone = 3 units. * Day 3: A, B, and C work together = $3 + 2 + 1 = 6 \text{ units}$. * Total work done in one 3-day cycle = $3 + 3 + 6 = 12 \text{ units}$. * **Calculate Number of Cycles:** * Total work needed = 60 units. * Number of 3-day cycles required = $60 \div 12 = 5 \text{ cycles}$. * **Determine Total Time:** * Total days = $5 \text{ cycles} \times 3 \text{ days/cycle} = 15 \text{ days}$. ### Exam Strategy & Shortcut Find efficiencies: A=3, B=2, C=1 based on LCM=60. Every 3 days, the work produced is $A + A + (A+B+C) \rightarrow 3 + 3 + 6 = 12$ units. Total work $60 \div 12 = 5$ cycles. $5 \times 3 \text{ days} = 15 \text{ days}$. ### Common Pitfall A frequent error is assuming B and C alternate their assistance on the third day, rather than assisting together. "assisted by B and C" implies both join simultaneously on that specific day. ### Final Answer Therefore, the correct answer is **15 days**.
Discussion & Comments
No comments yet. Be the first to comment!
Join Discussion