Dewatering practice: a single-stage well-point system can effectively lower groundwater and dewater an excavation down to approximately what maximum depth?
-
A10 m
-
B5 m
-
C25 m
-
D20 m
-
E15 m
Answer
Correct Answer: 5 m
Explanation
Introduction / Context:Well-point systems are widely used for lowering groundwater around shallow excavations. The achievable drawdown in a single lift is limited by suction and pump performance.
Given Data / Assumptions:
- Conventional single-stage well points connected to a header and a vacuum-assisted pump.
- Permeable soils where well points are effective.
- We seek the practical maximum depth of effective drawdown per stage.
Concept / Approach:Atmospheric pressure limits suction lifts to roughly 7–8 m under ideal conditions. Accounting for losses and field reality, the practical drawdown per stage is typically about 4.5–5.5 m. Hence, a single-stage system is generally capped at about 5 m. Deeper excavations require multi-stage well points or deep wells.
Step-by-Step Solution:Relate suction limit to groundwater drawdown capability.Apply field allowances: adopt ≈ 5 m for a single stage.
Verification / Alternative check:Manufacturers’ data and method statements frequently recommend further stages for depths exceeding ~5 m.
Why Other Options Are Wrong:
- 10–25 m: exceed practical single-stage limits; would require deep wells or staged systems.
- 15–20 m: similarly unrealistic for single-stage well points.
Common Pitfalls:
- Confusing deep well pumping (submersible pumps) with vacuum well points.
Final Answer:5 m