Curioustab
Aptitude
General Knowledge
Verbal Reasoning
Computer Science
Interview
Aptitude
General Knowledge
Verbal Reasoning
Computer Science
Interview
Home
»
Mechanical Engineering
»
Workshop Technology
The vertical welding do not require plate edge preparation upto 16 mm thickness.
Correct
Incorrect
Correct Answer:
Correct
← Previous Question
Next Question→
More Questions from
Workshop Technology
The process used to improve fatigue resistance of the metal by setting up compressive stresses in its surface, is known as
Which of the following statement is wrong?
The welding process used to join the ends of two pipes of uniform cross-section, is
For arc welding
The dowels are
In a four high rolling mill, the diameter of backing up rolls is __________ the diameter of working rolls.
Fin is a casting defect which is due to thin projections of metal not intended as a part of casting.
Seam weiding is a
For smoothing and cleaning out depressions in the mould, a __________ is used.
The algebraic difference between the maximum limit and the basic size is called
Discussion & Comments
No comments yet. Be the first to comment!
Name:
Comment:
Post Comment
Join Discussion
Discussion & Comments