A diagram showing the path followed by men and materials while performing a task is known as
string diagram
flow process chart
travel chart
flow diagram
Correct Answer:
flow diagram
← Previous Question
Next Question→
More Questions from
Industrial Engineering and Production Management
If (R) is the base rate guaranteed per hour, (S) is the standard time for the job and (T) is the actual time, then according to Rowan plan, wages for the job will be
Which one of the following chart gives simultaneously information about the progress of work and machine loading?
The procedure of modifying work content to give more meaning and enjoyment to the job by involving employees in planning, organisation and control of their work, is termed as
Which of the following wage incentive plan guarantees minimum wage to a worker and bonus is paid for the fixed percentage of time saved?
PERT analysis is based upon
A systematic job improvement sequence will consist of
In inventory control theory, the economic order quantity is
The routing function in a production system design is concerned with
Job evaluation is the method of determining the
The aim of value engineering is to
Discussion & Comments
No comments yet. Be the first to comment!
Name:
Comment:
Post Comment
Join Discussion
Discussion & Comments