A's 1 day's work = 1/2
B's 1 day's work = 1/3
A's share : B's share = 1/2 : 1/3 = 3/6 : 2/6 = 3 : 2
A's share (3/5) x 6000 = 3 x 1200 = ? 3600
? 20% of A's share 3600 x (20/100) = ? 720
4th observation i.e., 8 is the median.
47/10000 = .0047
.02 =(2/100) x 100% =2%
Let N / 11 = 233
Then, N = 233 x 11 = 2563
? Missing digit is 5.
121012 = 12 x 10084 + 4
? remainder = 4
We have the important relation, More work, More time (days)
? A piece of work can be done in 6 days.
? Three times of work of same type can be done in 6 x 3
= 18 days
? = 750.0003 ÷ 19.999
? ? ? 750 ÷ 20
? ? ? 375 ? 38