For under water concreting.
at least 10 percent more cement is required as compared to dry conditions
the volume of coarse aggregates shall not be less than one and half times and not more than twice that of fine aggregate
the slump should not be less than 100 mm and not more than 180 mm
dewatering by pumping is not done or until 24 hours thereafter
All the above
Correct Answer:
All the above
← Previous Question
Next Question→
More Questions from
Structural Design Specifications
Four reinforcing bars of 30 mm diameter each, are bundled in contact. The lower two bars extend up to end supports. The distance between the points of termination of the upper bars, is kept
In the formula
The staggered pitch is the distance between two consecutive rivets measured
A column of rectangular section is considered short, if both the slenderness ratios are less than
If a and b are the sides of a square column and its base, the thickness of the base may be calculated from the formula
The thickness of flat double lacing, is taken (where l is the effective length of the bar).
The side face reinforcement is provided if the depth of the web of a beam exceeds
The minimum thickness of the web plate for a crane gantry plate girder with a lifting load exceeding 15 tonnes, is
The structure which is subjected to an imposed load after 72 hours for a period of 24 hours, is deemed to be unacceptable if it fails to recover the net deflection less than
The effective length of lacing is the distance