logo

CuriousTab

CuriousTab

Discussion


Home Civil Engineering Estimating and Costing Comments

  • Question
  • Pick up the incorrect statement from the following:


  • Options
  • A. Lead is the average horizontal straight distance between the borrow pit and the place of spreading soil
  • B. The lead is calculated for each block of the excavated area
  • C. The unit of lead is 50 m for a distance upto 500 m
  • D. The unit of lead is 1 km where the lead exceeds 2 km.

  • Correct Answer
  • The unit of lead is 1 km where the lead exceeds 2 km. 


  • Estimating and Costing problems


    Search Results


    • 1. The value of 'B' of Indian type W.C. shown in the given figure is :

    • Options
    • A. 45 cm
    • B. 50 cm
    • C. 30 cm
    • D. 25 cm
    • Discuss
    • 2. The cost of the earthwork in excavation for the surface drain of cross-section shown in the given figure for a total length of 5 metres @ Rs. 450% cum, is

    • Options
    • A. Rs. 400
    • B. Rs. 425
    • C. Rs. 450
    • D. Rs. 500
    • Discuss
    • 3. Pick up the correct statement from the following:

    • Options
    • A. In order to check up the average depth of excavation, 'Dead mans' are left at the mid-widths of borrow pits
    • B. The earthwork calculation in excavation is made from the difference in levels obtained with a level
    • C. The earth work in excavation to form the road embankment includes the formation of correct profile and depositing the soil in layers
    • D. All the above.
    • Discuss
    • 4. The slope of the oultet of 'P trap' below the horizontal is kept

    • Options
    • A. 8°
    • B. 10°
    • C. 12°
    • D. 14°
    • Discuss
    • 5. The measurement is made in square metre in case of

    • Options
    • A. Cement concrete in foundation
    • B. R.C.C. structure
    • C. Hollow concrete block wall
    • D. Concrete fencing posts
    • E. None of these.
    • Discuss
    • 6. The expected out turn for earth work in excavation in ordinary soil per mazdoor per day is

    • Options
    • A. 1.00 cum
    • B. 2.00 cum
    • C. 3.00 cum
    • D. 4.00 cum
    • Discuss
    • 7. The unit of measurement is per quintal for the following:

    • Options
    • A. Collapsible gates with rails
    • B. Rolling shutters
    • C. Expanded metal wire netting
    • D. M.S. reinforcement of R.C.C. works.
    • Discuss
    • 8. For the construction of buildings, the subheads of the estimate are

    • Options
    • A. Earthwork, Concrete work, Brick work
    • B. Brickwork, Stone work, Roofing
    • C. Brickwork Flooring, Wood work, Steel work
    • D. Plastering or pointing, finishing, water supply and sanitary work
    • E. All the above.
    • Discuss
    • 9. The cross-section of a road partly in banking and partly in cutting is shown in the given figure. The area of the shaded portion is

    • Options
    • A.
    • B.
    • C.
    • D.
    • Discuss
    • 10. The weight of an item is measured correct to nearest

    • Options
    • A. 0.25 kg
    • B. 0.50 kg
    • C. 0.75 kg
    • D. 1.00 kg
    • E. 5 kg
    • Discuss


    Comments

    There are no comments.

Enter a new Comment