The method of draining in the tunnels, is generally known as
Options
A. foredrainage
B. dewatering
C. permanent drainage
D. All of the above.
Correct Answer
All of the above.
Tunnelling problems
Search Results
1. The following operations are generally employed for tunnelling in hard rock. 1. Removing ground water, 2. Loading holes and firing the explosive 3. Setting up and drilling 4. Grouting and lining 5. Removing muck 6. Ventilation and removing explosion dust The correct sequence is :