CuriousTab
Search
CuriousTab
Home
Aptitude
Computer
C Programming
C# Programming
C++ Programming
Database
Java Programming
Networking
Engineering
Biochemical Engineering
Biochemistry
Biotechnology
Chemical Engineering
Civil Engineering
Computer Science
Digital Electronics
Electrical Engineering
Electronics
Electronics and Communication Engineering
Mechanical Engineering
Microbiology
Technical Drawing
GK
Current Affairs
General Knowledge
Reasoning
Data Interpretation
Logical Reasoning
Non Verbal Reasoning
Verbal Ability
Verbal Reasoning
Exams
AIEEE
Bank Exams
CAT
GATE
IIT JEE
TOEFL
Jobs
Analyst
Bank PO
Database Administrator
IT Trainer
Network Engineer
Project Manager
Software Architect
Discussion
Home
‣
Civil Engineering
‣
Highway Engineering
Comments
Question
According to Highway Research Board of U.S.A. practical land width, is
Options
A. 2.7 m
B. 3.0 m
C. 3.3 m
D. 3.6 m
E. 4.5 m
Correct Answer
3.6 m
Highway Engineering problems
Search Results
1. Shoulders for high traffic volume roads, should
Options
A. be stable throughout the year to be used by vehicles in the case of emergency
B. support and protect the ends of carriage ways
C. not allow entrance of water to sub-grade
D. all the above.
Show Answer
Scratch Pad
Discuss
Correct Answer: all the above.
2. Pick up the correct statement from the following:
Options
A. During reconnaissance, the general route of the alignment is selected
B. After reconnaissance, a trace is cut for the alignment
C. Last stage is the detailed surveys for desired geometries'of the highway
D. All the above.
Show Answer
Scratch Pad
Discuss
Correct Answer: All the above.
3. The absolute minimum radius of horizontal curve for a design speed 60 km ph is
Options
A. 131 m
B. 210 m
C. 360 m
D. none of these.
Show Answer
Scratch Pad
Discuss
Correct Answer: none of these.
4. Thickness of a pavement may be reduced considerably by
Options
A. compaction of soil
B. stabilisation of soil
C. drainage of soil
D. combination of all the above.
Show Answer
Scratch Pad
Discuss
Correct Answer: combination of all the above.
5. The period of long term plan for the development of roads in India, known as Bombay Plan (Aug. 1958), is
Options
A. 5 years
B. 10 years
C. 15 years
D. 20 years
E. 25 years
Show Answer
Scratch Pad
Discuss
Correct Answer: 20 years
6. Pick up the correct statement from the following:
Options
A. Landing speed is directly proportional to the wing loading
B. Wing loading remaining constant, the take off distance is directly proportional to the powder loading
C. Neither (
a
) nor (
b
)
D. Both (
a
) and (
b
)
Show Answer
Scratch Pad
Discuss
Correct Answer: Both (
a
) and (
b
)
7. The reduced level of the proposed site of an air port is 2500 m above M.S.L. If the recommended length by I.C.A.O. for the runway at sea level is 2500 m, the required length of the runway is
Options
A. 2500 m
B. 3725 m
C. 3000 m
D. 3250 m
Show Answer
Scratch Pad
Discuss
Correct Answer: 3725 m
8. For the proposed runway stated in if the aerodrome reference temperature is 17°.2, the net designed length of the runway is
Options
A. 2716 m
B. 2816 m
C. 2916 m
D. 3016 m
Show Answer
Scratch Pad
Discuss
Correct Answer: 2816 m
9. The lift off distance is the distance along the centre of the runway between the starting point and
Options
A. end of the runway
B. end of stopway
C. point where air craft becomes air borne
D. point where air craft attains a height of 10.7 m
E. none of these.
Show Answer
Scratch Pad
Discuss
Correct Answer: end of the runway
10. Pick up the correct statement from the following:
Options
A. The speed of the aircraft relative to the ground, is called cruising speed
B. The speed of the aircraft relative to wind, is called air speed
C. When wind is blowing the direction of the flight, air speed is less than cruising speed
D. All the above.
Show Answer
Scratch Pad
Discuss
Correct Answer: All the above.
Comments
There are no comments.
Enter a new Comment
Save
More in Civil Engineering:
Advanced Surveying
Airport Engineering
Applied Mechanics
Building Construction
Building Materials
Concrete Technology
Construction Management
Docks and Harbours
Elements of Remote Sensing
Engineering Economy
Estimating and Costing
GATE Exam Questions
Highway Engineering
Hydraulics
Irrigation
Railways
RCC Structures Design
SI Units
Soil Mechanics and Foundation Engineering
Steel Structure Design
Strength of Materials
Structural Design Specifications
Surveying
Theory of Structures
Tunnelling
UPSC Civil Service Exam Questions
Waste Water Engineering
Water Resources Engineering
Water Supply Engineering