CuriousTab
Search
CuriousTab
Home
Aptitude
Computer
C Programming
C# Programming
C++ Programming
Database
Java Programming
Networking
Engineering
Biochemical Engineering
Biochemistry
Biotechnology
Chemical Engineering
Civil Engineering
Computer Science
Digital Electronics
Electrical Engineering
Electronics
Electronics and Communication Engineering
Mechanical Engineering
Microbiology
Technical Drawing
GK
Current Affairs
General Knowledge
Reasoning
Data Interpretation
Logical Reasoning
Non Verbal Reasoning
Verbal Ability
Verbal Reasoning
Exams
AIEEE
Bank Exams
CAT
GATE
IIT JEE
TOEFL
Jobs
Analyst
Bank PO
Database Administrator
IT Trainer
Network Engineer
Project Manager
Software Architect
Discussion
Home
‣
Civil Engineering
‣
Estimating and Costing
Comments
Question
The area of a sloping surface of a protective embankment of mean height
d
, side slopes
S
: 1 and length
L
is
Options
A.
d x d x s
B.
d
2
x (ds)
2
C.
L.D
1 +
s
2
D. 2
LD
1 +
s
2
Correct Answer
L.D
1 +
s
2
Estimating and Costing problems
Search Results
1. The expected out turn of 12 mm plastering with cement mortar is
Options
A. 2.5 sq m
B. 4.0 sq m
C. 6.0 sq m
D. 8.0 sq m
E. 10 sq m
Show Answer
Scratch Pad
Discuss
Correct Answer: 8.0 sq m
2. The measurement is not made in square metres in case of
Options
A. D.P.C. (Damp proof course)
B. Form works
C. Concrete Jaffries
D. R.C. Chhajja.
Show Answer
Scratch Pad
Discuss
Correct Answer: R.C. Chhajja.
3. The most reliable estiamte is
Options
A. Detailed estimate
B. Preliminary estimate
C. Plinth area estimate
D. Cube rate estimate
E. None of these.
Show Answer
Scratch Pad
Discuss
Correct Answer: Detailed estimate
4. The inspection pit or chamber is a manhole provided in a base drainage system
Options
A. at every change of direction
B. at every change of gradient
C. at every 30 m intervals
D. at the point where vertical soil pipe joins the house drain
E. All the above.
Show Answer
Scratch Pad
Discuss
Correct Answer: All the above.
5. According to ISI method of measurement, the order of the sequence is
Options
A. Length, breadth, height
B. Breadth, length, height
C. Height, length, breadth
D. None of these.
Show Answer
Scratch Pad
Discuss
Correct Answer: Length, breadth, height
6. Pick up the item of work not included in the plinth area estimate
Options
A. Wall thickness
B. Room area
C. Verandah area
D. W.C. area
E. Courtyard area.
Show Answer
Scratch Pad
Discuss
Correct Answer: Courtyard area.
7. If tensile stress of a steel rod of diameter
D
is 1400 kg/cm
2
and bond stress is 6 kg/cm
2
, the required bond length of the rod is
Options
A. 30
D
B. 40
D
C. 50
D
D. 53
D
E. 59
D
Show Answer
Scratch Pad
Discuss
Correct Answer: 59
D
8. The correct prismoidal formula for volume is
Options
A. D [first area + last area + ? Even area + 2 ? odd areas]
B.
[first area + last area + 4 ? Even area + 2 ? odd areas]
C.
[first area + last area + 2 ? Even area + 4 ? odd areas]
D.
[first area + last area + 2 ? Even area + 4 ? odd areas].
Show Answer
Scratch Pad
Discuss
Correct Answer:
[first area + last area + 4 ? Even area + 2 ? odd areas]
9. The brick work is measured in sq metre, in case of
Options
A. Honey comb brick work
B. Brick flat soling
C. Half brick walls or the partition
D. All the above.
Show Answer
Scratch Pad
Discuss
Correct Answer: All the above.
10. The total length of a cranked bar through a distance (
d
) at 45° in case of a beam of effective length
L
, is
Options
A.
L
+ 0.42
d
B.
L
+ 2 x 0.42
d
C.
L
- 0.42
d
D.
L
- 2 x 0.4
d
Show Answer
Scratch Pad
Discuss
Correct Answer:
L
+ 2 x 0.42
d
Comments
There are no comments.
Enter a new Comment
Save
More in Civil Engineering:
Advanced Surveying
Airport Engineering
Applied Mechanics
Building Construction
Building Materials
Concrete Technology
Construction Management
Docks and Harbours
Elements of Remote Sensing
Engineering Economy
Estimating and Costing
GATE Exam Questions
Highway Engineering
Hydraulics
Irrigation
Railways
RCC Structures Design
SI Units
Soil Mechanics and Foundation Engineering
Steel Structure Design
Strength of Materials
Structural Design Specifications
Surveying
Theory of Structures
Tunnelling
UPSC Civil Service Exam Questions
Waste Water Engineering
Water Resources Engineering
Water Supply Engineering