The most reliable estiamte is
Detailed estimate
Preliminary estimate
Plinth area estimate
Cube rate estimate
None of these.
Correct Answer:
Detailed estimate
← Previous Question
Next Question→
More Questions from
Estimating and Costing
The measurement is not made in square metres in case of
The expected out turn of 12 mm plastering with cement mortar is
The area of a sloping surface of a protective embankment of mean height d, side slopes S : 1 and length L is
Pick up the item of work not included in the plinth area estimate
If tensile stress of a steel rod of diameter D is 1400 kg/cm2 and bond stress is 6 kg/cm2, the required bond length of the rod is
The correct prismoidal formula for volume is
The brick work is measured in sq metre, in case of
The total length of a cranked bar through a distance (d) at 45° in case of a beam of effective length L, is
If the formation level of a highway has a uniform gradient for a particular length, and the ground is also having a longitudinal slope, the earthwork may be calculated by
A portion of an embankment having a uniform up-gradient 1 in 500 is circular with radius 1000 m of the centre line. It subtends 180° at the centre. If the height of the bank is 1 m at the lower end, and side slopes 2:1, the earth work involved.