  • Question
  • The most reliable estiamte is


  • Options
  • A. Detailed estimate
  • B. Preliminary estimate
  • C. Plinth area estimate
  • D. Cube rate estimate
  • E. None of these.

  • Correct Answer
  • Detailed estimate 


  • Estimating and Costing problems


    Search Results


    • 1. The inspection pit or chamber is a manhole provided in a base drainage system

    • Options
    • A. at every change of direction
    • B. at every change of gradient
    • C. at every 30 m intervals
    • D. at the point where vertical soil pipe joins the house drain
    • E. All the above.
    • Discuss
    • 2. According to ISI method of measurement, the order of the sequence is

    • Options
    • A. Length, breadth, height
    • B. Breadth, length, height
    • C. Height, length, breadth
    • D. None of these.
    • Discuss
    • 3. In long and short wall method of estimation, the length of long wall is the centre to centre distance between the walls and

    • Options
    • A. breadth of the wall
    • B. half breadth of wall on each side
    • C. one fourth breadth of wall on each side
    • D. None of these.
    • Discuss
    • 4. Pick up the correct statement from the following:

    • Options
    • A. The earth work of cutting in trenches or borrow pits in fairly uniform ground is measured with the help of average depths of the dead men
    • B. The earth work in trenches or borrow pits in irregular ground is measured by taking the difference in levels before and after completion of work
    • C. The earth work in trenches or borrow pits, where neither a nor b is feasible, are measured from the fillings after deduction of voids
    • D. All the above.
    • Discuss
    • 5. Pick up the incorrect statement from the following:

    • Options
    • A. Dimensions are measured to the nearest 0.01 m
    • B. Areas are measured to the nearest 0.01 sq.m
    • C. Cubic contents are measured to the nearest 0.1 cm m
    • D. Weights are measured to the nearest 0.001 tonnes
    • Discuss
    • 6. The measurement is not made in square metres in case of

    • Options
    • A. D.P.C. (Damp proof course)
    • B. Form works
    • C. Concrete Jaffries
    • D. R.C. Chhajja.
    • Discuss
    • 7. The expected out turn of 12 mm plastering with cement mortar is

    • Options
    • A. 2.5 sq m
    • B. 4.0 sq m
    • C. 6.0 sq m
    • D. 8.0 sq m
    • E. 10 sq m
    • Discuss
    • 8. The area of a sloping surface of a protective embankment of mean height d, side slopes S : 1 and length L is

    • Options
    • A. d x d x s
    • B. d2 x (ds)2
    • C. L.D 1 + s2
    • D. 2 LD 1 + s2
    • Discuss
    • 9. Pick up the item of work not included in the plinth area estimate

    • Options
    • A. Wall thickness
    • B. Room area
    • C. Verandah area
    • D. W.C. area
    • E. Courtyard area.
    • Discuss
    • 10. If tensile stress of a steel rod of diameter D is 1400 kg/cm2 and bond stress is 6 kg/cm2, the required bond length of the rod is

    • Options
    • A. 30 D
    • B. 40 D
    • C. 50 D
    • D. 53 D
    • E. 59 D
    • Discuss