CuriousTab
Search
CuriousTab
Home
Aptitude
Computer
C Programming
C# Programming
C++ Programming
Database
Java Programming
Networking
Engineering
Biochemical Engineering
Biochemistry
Biotechnology
Chemical Engineering
Civil Engineering
Computer Science
Digital Electronics
Electrical Engineering
Electronics
Electronics and Communication Engineering
Mechanical Engineering
Microbiology
Technical Drawing
GK
Current Affairs
General Knowledge
Reasoning
Data Interpretation
Logical Reasoning
Non Verbal Reasoning
Verbal Ability
Verbal Reasoning
Exams
AIEEE
Bank Exams
CAT
GATE
IIT JEE
TOEFL
Jobs
Analyst
Bank PO
Database Administrator
IT Trainer
Network Engineer
Project Manager
Software Architect
Discussion
Home
‣
Civil Engineering
‣
Irrigation
Comments
Question
The difference in level between the top of a bank and supply level in a canal, is called
Options
A. berm
B. free board
C. height of bank
D. none of these.
Correct Answer
free board
Irrigation problems
Search Results
1. For loss of head in a canal inverted syphon barrel, the factor in the Unwin formula
is a coefficient for loss of head due to
Options
A. friction
B. exit
C. entry
D. gradient
Show Answer
Scratch Pad
Discuss
Correct Answer: entry
2. The design of a retaining wall assumes that the retained earth
Options
A. is dry
B. is free from moisture
C. is not cohesives
D. consists of granular particles
E. all the above.
Show Answer
Scratch Pad
Discuss
Correct Answer: all the above.
3. If the permissible compressive stress for a concrete in bending is
C
kg/m
2
, the modular ratio is
Options
A. 2800/
C
B. 2300/2
C
C. 2800/3
C
D. 2800/
C
2
Show Answer
Scratch Pad
Discuss
Correct Answer: 2800/3
C
4. According to I.S. : 456 specifications, the safe diagonal tensile stress for M 150 grade concrete, is
Options
A. 5 kg/cm
2
B. 10 kg/cm
2
C. 15 kg/cm
2
D. 20 kg/cm
2
E. 25 kg/cm
2
Show Answer
Scratch Pad
Discuss
Correct Answer: 5 kg/cm
2
5. Cantilever retaining walls can safely be used for a height not more than
Options
A. 3 m
B. 4 m
C. 5 m
D. 6 m
E. 8 m
Show Answer
Scratch Pad
Discuss
Correct Answer: 6 m
6. Groynes are generally built
Options
A. perpendicular to the bank
B. inclined up stream up to 30°
C. inclined down stream upto 30°
D. all the above.
Show Answer
Scratch Pad
Discuss
Correct Answer: inclined up stream up to 30°
7. For the conditions enumerated to provide a crossing at
C
1
You will probably provide
Options
A. an aqueduct
B. a super-passage
C. a syphon aqueduct
D. none of these.
Show Answer
Scratch Pad
Discuss
Correct Answer: a super-passage
8. Side slopes generally kept for canals in loam soil, are :
Options
A. 1 : 1 in cutting and
: 1 in filling
B.
: 1 in cutting and 2 : 1 in filling
C. Neither (a) nor (b)
D. Both (a) and (b)
Show Answer
Scratch Pad
Discuss
Correct Answer: Both (a) and (b)
9. If the straight sides of a triangular section of a lined canal with circular bottom of radius
R
, make an angle ? with horizontal, the perimeter of the canal is
Options
A. R(? + tan ?)
B. 2R(? + tan ?)
C. R(? + cos ?)
D. 2R(? + cos ?)
E. none of these.
Show Answer
Scratch Pad
Discuss
Correct Answer: 2R(? + cos ?)
10. A river training work is generally required when the river is
Options
A. meandering
B. aggrading
C. degrading
D. all the above.
Show Answer
Scratch Pad
Discuss
Correct Answer: meandering
Comments
There are no comments.
Enter a new Comment
Save
More in Civil Engineering:
Advanced Surveying
Airport Engineering
Applied Mechanics
Building Construction
Building Materials
Concrete Technology
Construction Management
Docks and Harbours
Elements of Remote Sensing
Engineering Economy
Estimating and Costing
GATE Exam Questions
Highway Engineering
Hydraulics
Irrigation
Railways
RCC Structures Design
SI Units
Soil Mechanics and Foundation Engineering
Steel Structure Design
Strength of Materials
Structural Design Specifications
Surveying
Theory of Structures
Tunnelling
UPSC Civil Service Exam Questions
Waste Water Engineering
Water Resources Engineering
Water Supply Engineering