4*A + 7/B + 2*C + 5/D + 6*E =47.2506
=> 4 * A + 7/B + 2 *C + 5/D + 6*E = 40 + 7 + 0.2 + 0.05 + 0.0006
Comparing the terms on both sides, we get :
4*A =40, 7/B = 7, 2*C = 0.2, 5/D = 0.05, 6*E = 0.0006
A = 10,
B = 1,
C = 0.1,
D = 100,
E = 0.0001.
5*A + 3*B + 6*C + D + 3*E =(5*10) + (3*1) + (6*0.1) +100 +(3*0.0001)
=50 + 3 + 0.6 + 100 + 0.003 = 153.6003.
We have the important relation, More work, More time (days)
? A piece of work can be done in 6 days.
? Three times of work of same type can be done in 6 x 3
= 18 days
? = 750.0003 ÷ 19.999
? ? ? 750 ÷ 20
? ? ? 375 ? 38
Subtract 20, 25, 30, 35, 40, 45 from successive numbers. So 0 is wrong.
NA
Each previous number is multiplied by 2.
? 8 m shadow means original height = 12 m
? 1 m shadow means original height = 12/8 m
? 100 m shadow means original height = (12/8) x 100 m
= (6/4) x 100 = 6 x 25 = 150 m
Let 8% of 96 = y of 1/25
? (8 x 96)/100 = y/25
? y = (8 x 96 x 25)/100 = 192
Since the principal is not given, so data is inadequate.
Comments
There are no comments.Copyright ©CuriousTab. All rights reserved.