House construction (logical build order): Arrange— a. Plastering, b. Painting, c. Foundation, d. Walls, e. Ceiling.

Verbal Reasoning Logical Sequence of Words Difficulty: Easy
Choose an option
  • A
    a, b, c, d, e
  • B
    c, d, a, b, e
  • C
    c, d, e, a, b
  • D
    e, d, c, b, a
  • E
    None of these

Answer

Correct Answer: c, d, e, a, b

Explanation

Introduction / Context:Building construction proceeds from structural base to finishes.

Given Data / Assumptions:

  • Foundation first; then walls; then ceiling/roof structure; then internal finishes like plastering; finally painting.

Concept / Approach:Arrange by structural dependency and finish sequencing.

Step-by-Step Solution:

Foundation (c) → Walls (d) → Ceiling (e) → Plastering (a) → Painting (b).

Verification / Alternative check:Matches typical site workflows.

Why Other Options Are Wrong:They attempt finishing before structure.

Common Pitfalls:Painting before plastering.

Final Answer:c, d, e, a, b