House construction (logical build order): Arrange— a. Plastering, b. Painting, c. Foundation, d. Walls, e. Ceiling.
Verbal Reasoning
Logical Sequence of Words
Difficulty: Easy
Choose an option
-
Aa, b, c, d, e
-
Bc, d, a, b, e
-
Cc, d, e, a, b
-
De, d, c, b, a
-
ENone of these
Answer
Correct Answer: c, d, e, a, b
Explanation
Introduction / Context:Building construction proceeds from structural base to finishes.
Given Data / Assumptions:
- Foundation first; then walls; then ceiling/roof structure; then internal finishes like plastering; finally painting.
Concept / Approach:Arrange by structural dependency and finish sequencing.
Step-by-Step Solution:
Foundation (c) → Walls (d) → Ceiling (e) → Plastering (a) → Painting (b).Verification / Alternative check:Matches typical site workflows.
Why Other Options Are Wrong:They attempt finishing before structure.
Common Pitfalls:Painting before plastering.
Final Answer:c, d, e, a, b