Estimates of a water supply project depends upon the rate of water supply per capita consumption and probable population estimated at the end of the design period of
5 to 10 years
10 to 15 years
15 to 20 years
20 to 30 years
25 years.
Correct Answer:
20 to 30 years
← Previous Question
Next Question→
More Questions from
Water Supply Engineering
Surcharge storage zone of a reservoir, is
In a rapid gravity filter
Surface water may
135 litres of water per person per day, is provided in
The type of joint generally used in cast iron pipes, is
Velocity of flow of water in plain sedimentation water tank, is normally kept
Pick up the correct statement from the following :
Detention time for plain sedimentation tank usually ranges from
The rate of silting in a reservoir
Shales are
Discussion & Comments
No comments yet. Be the first to comment!
Name:
Comment:
Post Comment
Join Discussion
Discussion & Comments