The sewage is pumped up
from low lying areas
from flat areas
from basements
across a high ridge
all the above.
Correct Answer:
all the above.
← Previous Question
Next Question→
More Questions from
Waste Water Engineering
The screens are fixed
If the over land flow from the critical point to the drain is 8 km and the difference in level is 12.4 m, the inlet time is
The minimum recommended diameter of sewers, is
Aerobic bacterias
A sewer pipe contains 1 mm sand particles of specific gravity 2.65 and 5 mm organic particles of specific gravity 1.2, the minimum velocity required for removing the sewerage, is
In R.C. sewer pipes, the percentage longitudinal reinforcement to the cross-sectional area of concrete is kept
The width of a rectangular sewer is twice its depth while discharging 1.5 m/sec. The width of the sewer is
Chlorination of water is done for the removal of
The detention time of a circular tank of diameter d and water depth H, for receiving the sewage Q per hour, is
The ratio of minimum hourly flow to the average flow of sewage is