Home » Civil Engineering » Waste Water Engineering

The reduced levels of the string at the consecutive sight rails A and B are 203.575 m, 203.475 m respectively. If the difference of their R.D.s is 10 m, the gradient of the sewer line is

Correct Answer: 1 in 100 downward

← Previous Question Next Question→

Discussion & Comments

No comments yet. Be the first to comment!
Join Discussion