In R.C. sewer pipes, the percentage longitudinal reinforcement to the cross-sectional area of concrete is kept
10.0
5.0
2.0
0.25
Correct Answer:
0.25
← Previous Question
Next Question→
More Questions from
Waste Water Engineering
The width of a rectangular sewer is twice its depth while discharging 1.5 m/sec. The width of the sewer is
Chlorination of water is done for the removal of
The detention time of a circular tank of diameter d and water depth H, for receiving the sewage Q per hour, is
The ratio of minimum hourly flow to the average flow of sewage is
Dilution method of disposing off sewage, is not preferred to
An inverted siphon is designed generally for
The non-clog pump which permits solid matter to pass out with the liquid sewage, is
Pick up the in-correct statement from the following :
Bio-chemical oxygen demand (BOD) for the first 20 days in generally referred to
For treating the sewage of a large city, you will recommend