Pick up the correct statement from the following :
The larger the sewer in size, more will be velocity
The smaller the sewer in size, less will be velocity
The larger the sewer in size, no deposition will take place
The larger the sewer in size, deposition will take place.
Correct Answer:
The larger the sewer in size, deposition will take place.
← Previous Question
Next Question→
More Questions from
Waste Water Engineering
The presence of free ammonia in sewage, is detected by
The clarigesters are
During preliminary treatment of a sewage
A drop manhole is provided if
Nitrogen cycle of sewage, is
The drainage area of a town is 12 hectares. Its 40% area is hard pavement (K = 0.85), the 40% area is unpaved streets (K = 0.20) and the remaining is wooded areas (K = 0.15). Assuming the time of concentration for the areas as 30 minutes and using the formula the maximum run off is
The recommended detention period for grit chambers is
The most dangerous pollutant in vehicular emissions is
The gradient of sewers depends upon
For design purposes, the normal rate of infiltration of ground water into the sewer, is