During preliminary treatment of a sewage
Oil and grease are removed from skimming tanks
Floating materials are removed by screening
Girt and sand are removed by girt chambers
All the above.
Correct Answer:
All the above.
← Previous Question
Next Question→
More Questions from
Waste Water Engineering
A drop manhole is provided if
Nitrogen cycle of sewage, is
The drainage area of a town is 12 hectares. Its 40% area is hard pavement (K = 0.85), the 40% area is unpaved streets (K = 0.20) and the remaining is wooded areas (K = 0.15). Assuming the time of concentration for the areas as 30 minutes and using the formula the maximum run off is
The recommended detention period for grit chambers is
The most dangerous pollutant in vehicular emissions is
The gradient of sewers depends upon
For design purposes, the normal rate of infiltration of ground water into the sewer, is
Pick up the incorrect statement from the following :
For providing an Indian type W.C., the R.C.C. slabs in the toilet portion
Pick up the correct statement from the following :
Discussion & Comments
No comments yet. Be the first to comment!
Name:
Comment:
Post Comment
Join Discussion
Discussion & Comments