Curioustab
Aptitude
General Knowledge
Verbal Reasoning
Computer Science
Interview
Aptitude
General Knowledge
Verbal Reasoning
Computer Science
Interview
Home
»
Civil Engineering
»
Waste Water Engineering
The detention period for plain sedimentation water tanks, is usually
4 to 8 hours
8 to 16 hours
16 to 24 hours
24 to 36 hours.
Correct Answer:
4 to 8 hours
← Previous Question
Next Question→
More Questions from
Waste Water Engineering
Sewer ventilating columns are generally placed at
In case of Imhoff tanks,
Pick up the correct statement from the following :
In sewers the highest non-scouring velocity is achieved in
The standard B.O.D. of water is taken for
The ratio of the diameter of a circular section and the side of a square section hydraulically equivalent, is
The digested sludge from septic tanks, is removed after a maximum period of
The settling velocity of the particles larger than 0.06 mm in a settling tank of depth 2.4 is 0.33 m per sec. The detention period recommended for the tank, is
In a city the ratio of the drainage to sewage is 20, the percentage discharge passing through non-monsoon periods, is
The effluent of a septic tank is
Discussion & Comments
No comments yet. Be the first to comment!
Name:
Comment:
Post Comment
Join Discussion
Discussion & Comments