Curioustab
Aptitude
General Knowledge
Verbal Reasoning
Computer Science
Interview
Aptitude
General Knowledge
Verbal Reasoning
Computer Science
Interview
Home
»
Civil Engineering
»
Surveying
While surveying a plot of land by plane tabling, the field observations
and plotting proceed simultaneously
and plotting do not proceed simultaneously
and recorded in field books to be plotted later
all the above.
Correct Answer:
and plotting proceed simultaneously
← Previous Question
Next Question→
More Questions from
Surveying
A dumpy level was set up at mid-point between pegs A and B, 80 m apart and the staff readings were 1.32 and 1.56. When the level was set up at a point 10 m from A on BA produced, the staff readings obtained at A and B were 1.11 and 1.39. The correct staff reading from this set up at S should be
In a precision traverse, included angles are measured by setting the vernier
Pick up the correct statement from the following :
The rise and fall method of reduction of levels, provides a check on
An angles of 45° with a chain line may be set out with
In chain surveying, perpendiculars to the chain line, are set out by
The area of any irregular figure of the plotted map is measured with
If Δ is the angle of deflection of a simple curve of radius R, the length of the curve is :
is the conventional sign of
The sag of 50 m tape weighing 4 kg under 5 kg tension is roughly
Discussion & Comments
No comments yet. Be the first to comment!
Name:
Comment:
Post Comment
Join Discussion
Discussion & Comments