Correction per chain length of 100 links along a slope having a rise of 1 unit in n horizontal units, is
100 n2
.
Correct Answer:
← Previous Question
Next Question→
More Questions from
Surveying
Which one of the following statements is correct?
Prolongation of chain line across an obstruction in chain surveying, is done by
Bergchrund is a topograhical feature in
To avoid large centering error with very short legs, observations are generally made
The line of sight is kept as high above ground surface as possible to minimise the error in the observed angles due to
While measuring the distance between two points along upgrade with the help of a 20 m chain, the forward end of the chain is shifted forward through a distance
If the whole circle bearing of a line is 180°, its reduced bearing is
For indirect ranging, number of ranging rods required, is
To orient a plane table at a point P roughly south of the mid-point of two inaccessible conical hill stations A and B in the plains, a point C is selected in line with AB and table is oriented at C by bringing ab in line with AB. A ray is then drawn towards P and at P the table is oriented by back ray method. The orientation so obtained, is
The ratio of the length of long chord and the tangent length of a circular curve of radius R deflecting through angle Δ, is