The conventional sign shown in below figure represents a
bridge carrying railway below road
bridge carrying road below railway
bridge carrying road and railway at the same level
a level crossing.
Correct Answer:
bridge carrying road below railway
← Previous Question
Next Question→
More Questions from
Surveying
For taking offsets with an optical square on the right hand side of the chain line, it is held
While setting a plane table at a station it was found that the error in centering was 30 cm away from the ray of length 40 m drawn from the station. If the scale of the plan is 1 cm = 2 cm, the displacement of the end of the ray in plan from the true position will be
The angle of intersection of a curve is the angle between
If 50 m point of a 100 m tape is 50 cm off line, and 50 m sections are straight, an error is generated equal to
If i is the stadia distance, f is the focal length and d is the distance between the objective and vertical axis of the techeometer, the multiplying constant, is
Correction per chain length of 100 links along a slope of α° is
Location of contour gradient for a high way is best set out from
Staff readings on pegs x and y from X station are 1.755 m and 2.850 m, and from station Y on staff head at Y and X are 0.655 m and 1.560 m. If reduced level of X is 105.5 m, the reduced level of Y is
Stadia techeometry was discovered by James Watt in the year.
The correction to be applied to each 30 metre chain length along θ° slope, is
Discussion & Comments
No comments yet. Be the first to comment!
Name:
Comment:
Post Comment
Join Discussion
Discussion & Comments